Posted by Stephen Adler on March 30, 2018, 11:05 pm, in reply to "Re: Rain Water"
Wally in December 2016 the North Pump Station was operating at 55% capacity.5 pumps... One pump was out, and another pump was running with the impeller disconnected. (pumping nothing)
Today we're at about 75% with full capacity due in April.