Posted by Malcolm Probert on November 18, 2012, 4:21 pm, in reply to "Transit Connect"
Malcolm Probert
With IDS, the test to measure/determine the pumps output, is basically, crank for 5 seconds with the IMV disconnected. So, there is no need to remove the pipe. The pressure build-up during cranking is displayed on a graph.