Metal is right, this stuff takes time. Ground has to settle right before you add onto structural stuff.
Think of it like this.
The bridge weighs a crap ton anyway, now add the tonnage of cars..if you dont ensure that properly sets in the ground..the weight distribution will slowly push the bridge out of tolerance (could take years, but it will happen) and you could have catastrophic failure.