Anybody in the know as to how things will work with the new footbridge at Sandhills? I'm assuming the marshalling area will be enlarged? Possibly to twice the size? Will the bridge be used just for exiting the station and the existing entrance for entering. Both will be used for both purposes? Just curious. We'll find out on the 9th. Thanks.