This messageboard is for Adults 18 years and over.
If you are under this age please leave the board.

Luton Outlaws accepts no responsibility for the content of this messageboard nor any other content posted on it.

Luton Outlaws disclaims all liability for such content to the fullest extent permitted by law.

What you read on here is 100% conjecture, fiction, lies, bullshit and complete bollocks. If you want to be taken seriously, you are in the wrong place.

Any potentially libellous comments that might jeopardise the future of this messageboard will therefore be deleted, and the person posting them will receive a ban.Enjoy.

    PC delay?

    Posted by Melbourne Hat on 24/6/2026, 7:00:48

    In the drone footage by the 'Wandering Northerner' bloke, he mentions drainage and pipes that have been lying around the PC site for months a lot.

    I found as letter from the 'Local Flood Authority' in the planning portal documents relating to PC.

    It has has this to say about drainage etc:

    "No drainage works shall take place until a detailed construction phase surface water
    management plan for the site has been submitted in writing to the Local Planning
    Authority for approval. The scheme shall subsequently be carried out only in strict
    accordance with the approved details.
    In relation to Condition 60, the construction drawings of the surface water drainage
    network for the stadium, associated sustainable drainage components, flow control
    mechanisms and outfall details are missing from the submission and therefore we are
    unable to recommend the discharge of the condition at this time. The only construction
    drawings available are of the proposed foul system. Once the surface water drainage
    construction drawings for the Stadium have been submitted we would be happy to review
    and provide further comment.
    In relation to condition 63 and 64 these conditions currently cover the entire application
    boundary, The current details submitted only cover the stadium and therefore further
    details are required in relation to the proposal for the remainder of the site. In relation to
    the Stadium further details are required regarding the construction of the outfalls to the
    River Lea and the installation of the Hydrobrakes. Details are required on the timing of
    these installations in relation to the site construction, how discharge rates are to be
    managed throughout the construction to ensure rates are not increased from existing. In
    addition a phasing plan including location of mitigation measures (i.e. straw bales) and
    the temporary features should be included for each step of the construction phase."



    This is dated 28th May, so quite recent.

    So there seems to be a delay here until extra details have been provided regarding drainage for the whole site instead of just the stadium itself.

    Anyone got any straw bales going spare?









    Yes I am bored.

      Re: PC delay?

      Posted by Findlay on 24/6/2026, 9:22:11, in reply to "PC delay?"

      It seems fairly standard stuff, I have seen similar responses on now approved ammendments.

        Re: PC delay?

        Posted by Melbourne Hat on 24/6/2026, 11:47:16, in reply to "Re: PC delay?"

        Yes, fair enough.

        I thought it was interesting to see some explanation why that bit seemed to have stalled.

        Re: PC delay?

        Posted by LTFC39 on 24/6/2026, 7:22:30, in reply to "PC delay?"

        He does great videos, but he could go a little bit of research in the planning docs as some of his questions may well be answered.

        I’m not quite sure how the consultants missed something like this. I’m going to presume there is more to it than what meets the eye.

          Re: PC delay?

          Posted by J in C on 24/6/2026, 10:14:22, in reply to "Re: PC delay?"
          WUM Extraordinaire

          They probably didn't miss anything

          Re: PC delay?

          Posted by J in C on 24/6/2026, 7:03:05, in reply to "PC delay?"
          WUM Extraordinaire

          Or maybe you are trying to stir up the usual nut jobs

            Re: PC delay?

            Posted by The DG on 24/6/2026, 12:52:14, in reply to "Re: PC delay?"

            That’s your life’s work King Prat.

              Re: PC delay?

              Posted by Wilt on 24/6/2026, 17:26:17, in reply to "Re: PC delay?"

              Indeed, while not grifting.

              Re: PC delay?

              Posted by bbb on 24/6/2026, 7:20:03, in reply to "Re: PC delay?"
              WUM 2

              Far more interesting than the guff posted yesterday.
              Comms from the club are very quiet as usual. We don't need to know everything but if it wasn't for this bloke and his drone and people like Melbourne lookimg into things, we'd know absolutely nothing about progress at PC.

                Re: PC delay?

                Posted by Ostrich spotter on 24/6/2026, 11:07:00, in reply to "Re: PC delay?"

                We used to get regular updates in the summer as to how the pitch was coming along. Now we have a new stadium on the horizon we get zilch. Explain that

                  Re: PC delay?

                  Posted by HuN on 24/6/2026, 12:34:09, in reply to "Re: PC delay?"

                  What do you want them to say?

                  "today at Power Court we erected lots of supporting steelwork and poured absolutely shit tons of concrete. We also dug a few holes and filled others in.
                  There were no onsite injuries and everyone had a nice lunch"






                  “You get a wonderful view from the point of no return.” Terry Pratchett

                    Re: PC delay?

                    Posted by Ostrich spotter on 24/6/2026, 17:43:24, in reply to "Re: PC delay?"

                    My point was they used to tell us the grass had grown 50mm in a week so an update of any sort on something significantly more important than the state of the pitch over summer should probably get a little mention here or there

                      Re: PC delay?

                      Posted by Music Critic on 24/6/2026, 16:38:59, in reply to "Re: PC delay?"

                      Well, considering it is the most important thing the club will ever do, some kind of 'drum beat' on progress would be expected, surely?

                      I'm not saying that should be coming up with stuff every day or even every week but there must be a project plan (isn't there?), so time some comms with milestones when they have been reached/surpassed. Keeps the most important thing the club has ever done in the news and fans regularly updated

                      It is very quiet

                        Re: PC delay?

                        Posted by HuN on 24/6/2026, 18:07:55, in reply to "Re: PC delay?"

                        Maybe they could approach that 'Wandering Northener' bloke, offer space on the website for his weekly videos. At the least they could post a weekly link to the latest one on Youtube.

                        Or maybe there are too many 'terms & conditions' and legal hoops to jump through.



                        “You get a wonderful view from the point of no return.” Terry Pratchett

                          Re: PC delay?

                          Posted by Music Critic on 24/6/2026, 18:17:41, in reply to "Re: PC delay?"

                          Or they could just do something themselves? Like most clubs that have built a new ground

                          As I say, this is the most important thing the club will ever do. Good news stories should be pouring (like concrete) out of the stadium build. Yet it is all strangely quiet

                            Re: PC delay?

                            Posted by bbb on 24/6/2026, 18:31:14, in reply to "Re: PC delay?"
                            WUM 2

                            A lack of communication leads to that void being filled with rumours. The latest one being its 6 months behind schedule(of the 26th estimated completion date)

                            Give it a few months, there'll be the standard 'we know communication is poor, we're working to improve that' guff in a match programme. For the 18th time.

                            Do they really think so little of the peasants nowadays that they refuse to give even a slight update?

                              Re: PC delay?

                              Posted by Music Critic on 24/6/2026, 18:53:10, in reply to "Re: PC delay?"

                              If that is true and there is another delay, I wonder what the excuse be this time

                              "The war against Napoleon has led to a shortage of concrete..."

                                Re: PC delay?

                                Posted by m on 24/6/2026, 19:09:12, in reply to "Re: PC delay?"

                                A massive theme park being built up the road !!

                  Re: PC delay?

                  Posted by Melbourne Hat on 24/6/2026, 7:06:09, in reply to "Re: PC delay?"

                  Just sharing what is accessible in the public domain to help answer some questions that have been raised.


                  Take it whatever way you like champ.

                    Re: PC delay?

                    Posted by J in C on 24/6/2026, 10:13:15, in reply to "Re: PC delay?"
                    WUM Extraordinaire

                    I did

              [ Luton Outlaws - The Avenue of Evil ]

              DISCLAIMER

              The posts made on this board are the opinions of the people posting them and do not always reflect the opinion of the board administration.

              Luton Outlaws is a totally independent forum, paid for and run by supporters of Luton Town and is not associated with Luton Town Football Club, lutontown.co.uk, lutonfc.com, Loyal Luton Supporters Club, Trust in Luton, Luton Town Supporters Club or anyone else for that matter and is declared a 100% Tombola Free Zone.

                Luton Outlaws accepts no responsibility for the content of this messageboard nor any other content posted on it. Luton Outlaws disclaims all liability for such content to the fullest extent permitted by law.

                What you read on here is 100% conjecture, fiction, lies, bullshit and complete bollocks. If you want to be taken seriously, you are in the wrong place. Enjoy. Admin contact - dilligaf.outlaws@gmail.com.

              eXTReMe Tracker