Attached is the status video showing progress on the Texas for 06-February-2026. A walkaround showing progress on the deck installation, osprey mess, non-skid remains and other events.
Interesting comparison showing the size of welded remains of the signal bridge 1.1-inch mount base compared to that of a quad 40. Volunteer work showing monkey fist and turk's head finishes on the signal halyards
Inside the officer's wardroom the installation of period appearing insulation on bulkheads & pipes. Brass and copper brightwork.
These decks are in a red [lead?]. Correct, Im assuming? I thought that many interior non-weather decks were in what was essentially interwar Standard 20 Deck