Listing Price: $14 million
Closing Price: $12.1 million on Nov. 8
Square Feet: 4,170
Lot: 6.44 acres
Built: 2007
Bedrooms: 1
Bathrooms: 2 full, 2 half
Features: The best available property for anyone wanting to own stables near the Winter Equestrian Festival. Located in Grand Prix Village, this barn was designed by top horsemen, and is available for purchase for the first time since it was built in 2007. There are 30 stalls, paddocks, world class riding arena, walker, manager's apartment, owners' lounge, office, commercial laundry, and much more! All within steps of the WEF show grounds., Professionally built custom oversized riding ring measuring 240 x 120 with state of the art footing made for grand prix jumping 76 feet around state of the art automatic covered hot walker with rubber flooring. Manufactured and installed by Roewer-rueb out of Germany. New flooring was installed in 2016. Walker holds 6 total horses and is a great alternative for exercise. 30 stall barn separated perfectly for owner occupied/rental income investment Barn flooring and stall flooring is heavy duty thick rubber flooring great for horses and non slip surface and is easy to clean and maintain looking great year after year All 30 stalls are equipped with Nelson automatic horse waterers. When the horse drinks the bowl auto fills back to full. 6 oversized grooming stalls with great overhead lights 4 outdoor covered wash stalls equipped with rubber flooring and designated drains per stall 2 private lockable air conditioned tack rooms great for storing your special tack Break.lunchroom with refrigerator and is air conditioned Men s and women s private air conditioned bathrooms Oversized air conditioned laundry room with commercial speed queen double washer and dryer Designated covered in the barn area for your horse treadmill, wired and ready for hookup 8 total oversized large outdoor paddocks 7 at 60 x 60 and one at 80 x 40 All stalls were manufactured and shipped from Norwich England by Loddon Engineering. New standing seam metal roof installed on the entire facility in 2016.
MAGA
Responses