Posted by Sandi M in Chicagoland on February 8, 2022, 7:42 pm
On my last five blog posts more progress has been made. The girls checkout the new floor before the plank flooring is installed.
Sure makes a difference on the 2nd floor of the townhouse.
Back in the Victorian Mansion a tutorial on the 'new' redone door!
And it's installation.
Russell, the general contractor, talks to the girls and only a couple of things need doing before listing the property next weekend. And, has pizza and catches up with them.
Only three girls are left in the remodeled house, and Foofie is 'confused'. (The guys are in the two basement apartments which have been connected together under the Mansion.)
Richelle farmed-out the blue couches to get redone for the Townhouse. Tutorial and materials information on another blog post.
Russell evaluates his guys' work. Folding wall for the second floor bedroom and window,
It's a tight squeeze but..
also the bathroom door and the new tub!
The hood and microwave are in and Richelle is thrilled with the 'new' look on the blue couches. Staging two houses for the weekend is a huge job!
Some select pieces are placed and photos taken!
Rock work's completed and the support posts. What's still left to do in these houses???