| Layout
Posted by Trail Nut on May 26, 2009, 10:35 am 70.226.75.X
Back a few years ago when I tore out my layout I had an idea of what I wanted. A large layout based on the C&O's Elmdale Sub. It would be housed in a seperate building with it's own heater and air conditioner.
Well here I am three years later and still no layout. I have drawn up several plans that I liked but I just couldn't decide what to build. I got to thinking, maybe a small version of the "Dream" layout would work.
Here is a sketch of the proposed layout. The Greenville morning local ran south to Lowell and served Belding also. I could model the Greenville yard, Belding and Lowell like they were in the late 40's to mid 50's. The local would pull any Belding cars out of the yard and head south switching Belding and leaving the outbounds there. It would then caboose hop to Lowell where it would switch the customers there, leaving the cars on a siding for train 23 to pick up. It would then caboose hop back to Belding, pick up any outbound cars and run back to the yard. I could also model train 23 (and maybe 22), the westbound train that made most of the pick-ups and setouts at Alma, Edmore, Greenville and Lowell. The layout is small enough for me to build in a relatively short time, based on one of my favorite prototypes and I could slide the time period from 1947 (all steam) to the early 1950's (diesels). Locos I couls use would be PM Consolidations, Mikados, EMD switchers, C&O BL-2's, GP-7's and EMD switchers.
|
Post a Response
|