Posted by Trail Nut
![]()
on May 28, 2009, 10:30 am, in reply to "Color version"
70.226.75.X
I was thinking of having a scrolling time line on my "proposed" layout. It would start in 1947 with PM steam, then move to 1948 with a BL2 on the local. Next is 1952 with a PM switcher and GP7's on the way freight. In 1955 I would use a C&O switcher with a pair of 5900 GP9's on train 23. For 1958 a C&O switcher on the local with a 5900 GP9 and a "yellow stripe" scheme BL2 on 23. Lastly in 1962 a SW9 on the local with a pair of new GP30's on the freight. The time switch would include a few removeable buildings, some freight cars and locos, and newer vehicles. The layout could go from steam to second generation diesels in a 15 year period. TN
A photo of my old layout.
163
Responses: