Posted by WE4000 on 5/20/2009, 10:21 pm, in reply to "WE connection to NS at Bellevue"
There are 2 connection tracks with the Wheeling in Bellevue. The Brewster Connection comes out near Bellevue Tower and heads East into the yard. The Lakeshore Connection comes out to the West just to the East of the Southwest Street interlocking. Wheeling trains going to Toledo use the Lakeshore Connection, and most of the time they pull toward the Fostoria District and reverse direction and head toward Toledo. Those trains typically run with power on both ends.
Message Thread:
![]()
« Back to thread
This site is brought to you by RC, Jason Roberts and Chris Toth. It is not affiliated, sponsored or supported by the Wheeling & Lake Erie Railway Company. The content of this site is meant soley for entertainment purposes. Any improper messages posted to this bulletin board will be promptly removed and the poster will be BANNNED from making any further posts.