Still working on the pictures. I spent most of my evenings last week working on finally reassembling my layout table and (after 3 trips to Home Depot) was able to replace the foam sections my layout is built on last night, reinstall both main lines, and run a train on each. I still have a lot of work as far as reinstalling the rest of my track, as well as finding a way to level out the foam sections, but it sure is nice to be able to run trains again!
Charles W.
305
Message Thread
« Back to index